Use
Display Options for BOM
You can define how a multi-level BOM is displayed in the configuration result when you explode the BOM:
Comp-1
Comp-2
Comp-3
--------------------------------
Comp_2-1
Comp_2-2
Comp_2-3
--------------------------------
Comp_2-2-1
Comp_2-2-2
Comp-1
Comp-2
Comp_2-1
Comp_2-2
Comp_2-2-1
Comp_2-2-2
Comp_2-3
Comp-3
Special Procurement Key for Phantom Assemblies
You can define whether special procurement key 50 (phantom assembly) is read.
Special procurement key 50 is assigned in the MRP data of a material master record.
This key means that components of these assemblies are grouped together for logical or logistical reasons, but the assembly is not actually assembled.(See the R/3 Library PP Material requirements planning (MRP)
Phantom Assemblies)
Scope of the BOM Explosion
You can define the following settings for the BOM explosion:
Components that have not been selected are checked with an x.
Procedure
1.
On the result screen, choose View ® Display options.You can define display options and settings for the special procurement key.
2.
On the result screen, choose View ® Scope, to define the scope of the BOM explosion.
The settings defined in the configuration profile or in the Settings on the value assignment screen do not influence the result screen.