Early Warning System: Overview
Early Warning System: Basics
Exceptions
Creating an Exception
Access: Specifying the Information Structure, Name and Descripti
Selecting Characteristics and Storing Characteristic Values
Requirements
Defining/Changing Requirements
Determining Follow-Up Processing
Changing an Exception
Changing Characteristics and Characteristic Values
Displaying an Exception
Threshold Value Analysis
Example: Threshold Value Analysis
Trend Analysis
Planned/Actual Comparison
Examples: Planned/Actual Comparison
Exception Groups
Creating an Exception Group
Changing an Exception Group
Displaying an Exception Group
Example: Exception Group
Allocations
Allocating Exceptions
Example: Allocation Rules
Changing Allocations
Determining Follow-Up Processing for the Exception
Periodic Analyses
Creating an Analysis Area
Changing an Analysis Area
Deleting the Analysis Area
Displaying an Analysis Area
Scheduling the Periodic Analysis
Exception Analysis
Performing an Exception Analysis