Purpose
This process describes how to procure materials from a vendor using a JIT call.
Prerequisites
Your material must be assigned to a storage location.
If necessary you must also make scheduling entries in the control cycle. Please also read the section
Process Flow
To group material requirements, please also see
Grouping Kanbans to a Summarized JIT Call.You can transmit the message at various times:
For the last two options you create a list of messages with help from selection criteria. You can transmit the desired message from this list to the vendor. See also
You determine the time of the output in Customizing on creating a Message type under Default values in the field Time.