Entering content frameProcedure documentation Executing Accrual Calculations Locate the document in its SAP Library structure

Prerequisites

You can execute accrual calculations after you have defined an overhead structure and maintained the relevant data for this structure, or after you have maintained your target=actual credit postings.

Note

You can simulate the accrual calculation for testing or forecasting purposes. To do so, select Test run on the initial screen.

This function lets you check the results of the accrual calculation without making any changes in the database.

Procedure

  1. To carry out accrual calculation in plan or actual, from the Cost Center Accounting menu, choose:
    1. Planning ® Planning aids ® Accrual calculation or
    2. Period-end closing ® Single functions ® Accrual calculation
  2. On the initial screen, enter the fiscal year and the posting period.
  3. You can calculate accruals for an individual cost center, a cost center group, or the entire controlling area. A cost center group can be any group stored in the system. You may also use the standard hierarchy or selected parts thereof.

    When calculating plan accrual, also specify the version.

  4. Select or deselect:
    1. Background processing
    2. Test run
    3. Detailed lists

    Note

    If you do not select Background processing, the system carries out accrual calculation online. The display shows the values calculated for the accrual cost elements. If you have large amounts of data to process, we advise running accrual calculation in the background. This means you can process data at times of minimal system usage.

    Note

    If the Detailed list indicator is active, the R/3 System displays a list of accrual calculation results. The Detailed list and Test run indicators are defaulted to active. This ensures that you can check the results of the test run.

  5. You can enter further data on the initial screen as follows:
    1. To set the value date for the actual accrual calculation manually, choose Extras ® Value date….
    2. If you do not enter a value date, the system converts the currencies using the last day of the posting period.

    3. To change the controlling area, choose Extras ® Set controlling area.
    4. To maintain the user parameters, choose Environment ® User parameters.
      1. To store the values that you specified on the initial screen as user parameters, activate the corresponding parameters and choose Save.
      2. This saves the current user parameter setup as a default.

      3. To change your entries on the initial screen and to have these new values stored in your user parameters, you must re-save the parameters.
    5. To display the controlling area ® overhead structure assignments, choose Goto ® Assignments…
    6. Once you have executed the accrual calculation, you can display any errors that occurred and the processing statistics by choosing Goto ® Statistics.
  6. Choose Execute.

Result

In the results list screen, choose Goto ® Messages or Statistics.

The detail lists display the values calculated by cost center/activity type/allocation cost element.

Note

The R/3 System records sender and receiver line items and totals records for accrual postings. The posting date of actual accrual is always the last day of a calendar month. The posting date of plan accrual is always the first day of a calendar month.

If you repeat the calculation, the system records one line item each detailing the difference between the previous and the current run.

 

 

Leaving content frame