Planning Process
Checking the Planning File
Individual Customer Planning File Entries
Planning Run Type
Planning Mode
Calculating Low-Level Codes
Displaying the Planning File
Setting Up the Planning File
Creating Entries in the Planning File Manually
Check the Consistency of the Planning File
Net Requirements Calculation
Net Requirements Calculation for MRP
Net Requirements Calculation for Reorder Point Planning
Net Requirements Calculation for Forecast-Based Planning
Gross Requirements Planning
Calculating Procurement Quantity
Lot-Sizing Procedures
Static Lot-Sizing Procedures
Lot-for-Lot Order Quantity
Fixed Lot Size
Replenishment up to Maximum Stock Level
Period Lot-Sizing Procedures
Availability Date for Period Lot-Sizing Procedure
Example for Determination of Availability Date
Delivery Date Instead of Availability Date
Example for Delivery Date Instead of Availability Date
Optimum Lot-Sizing Procedures
Part Period Balancing
Least Unit Cost Procedure
Dynamic Lot Size Creation
Groff Reorder Procedure
Lot Sizes with Splitting and Overlapping
Short-Term and Long-Term Lot Size
Lot-for-Lot Remaining Order Quantity
Calculating Scrap
Assembly Scrap
Component Scrap
Operation Scrap
Rounding
Rounding Profile
Examples for Calculating Procurement Quantities and Yields
Scheduling
Scheduling: In-House Production
Calculating Basic Dates
In-House Production Time: Independent of Lot Size
In-House Production Time: Dependent on Lot Size
Backward Scheduling for In-House Production
Example of Backward Scheduling for In-House Production
Forward Scheduling for External Procurement
Calculating Production Dates (Lead Time Scheduling)
Levels of Scheduling
Determining Capacity Requirements
Starting Lead Time Scheduling
Calculating the Provision Date for Components
Scheduling for External Procurement
Backward Scheduling for External Procurement
Example of Backward Scheduling for External Procurement
Forward Scheduling for External Procurement
Example of Forward Scheduling for External Procurement
Determining the Procurement Proposal
Procurement Type and Special Procurement Type
Quota Arrangements
Determining Source of Supply for External Procurement
Scheduling Agreements for Make-to-Order Production
Shipping Notification
Document Types for Purchase Requisitions
BOM Explosion and Determining Dependent Requirements
Determining the Valid BOM
BOM Usage
Period/Area of Validity of BOMs
BOM Explosion Number (Fixed Key Date)
BOM Status
Multiple BOMs
BOM Selection Using Order Quantity
BOM Selection Using Explosion Date
BOM Selection Using Production Version
Determining the Valid BOM Items
Alternative Items
Alternative Items in BOM Explosion
Alternative Items for Information Purposes
Withdrawal Posting of Alternative Items
Discontinued Parts
BOM Items Relevant for Production
BOM Explosion for Variant Configuration
BOM Explosion with Phantom Assemblies
Total Requirements
Calculating the Dependent Requirements Date
Storage Location Determination in BOM Explosion
Linking the Revision Level
Checking the Revision Level in MRP
Adapting the Revision Level if Dates Change
Creation of Exception Messages
Rescheduling Check
Ranges of Coverage in MRP
Calculating the Statistical Range of Coverage
Calculating the Average Daily Requirements
Calculating the Minimum, Maximum and Target Stock Level
Calculating Dynamic Safety Stock
Example for Calculating Statistical Range of Coverage
Results of the Statistical Range of Coverage Calculation
Values of the Statistical Range of Coverage
Safety Time / Actual Range of Coverage
Days’ Supply and Receipt Days’ Supply
Actual Range of Coverage