Creating a Manual Call
Use
By means of a manual call, you can add a new test date without affecting the normal scheduling. You can specify the required call date and package which should be due on this new date.
You can create a manual call, for example, if you added another storage condition to a stability study after the scheduling for the study was already triggered.
Procedure
The initial screen for scheduling a maintenance plan (testing schedule) appears.
The screen for scheduling the maintenance plan appears.
A dialog box for entering a start date (manual call) appears.
Another dialog box is displayed in which you can select the desired package for the test date.
The selected package is copied and the system creates a new manual test date for the original planned date.
Inspection lots are created immediately by the system for all storage conditions that are due on this date.

Since two inspection lots may now exist for a planned date and storage condition (that is, for the original date and the date of the manual call), you must
cancel the unneeded inspection lot. Only one uncancelled inspection lot should exist for each storage condition and test date. By cancelling the unneeded inspection lot, the system informs the scheduling function that no confirmation will posted for this lot. This inspection lot is considered to be completed.