Create Line Segments
Prerequisites
You have created a work center in the system for all the line segments you want to create.
Procedure
Line segments.The system displays the graphic display of the line hierarchy, which already contains the header of the line hierarchy.
Line segment.The dialog box entitled Select line segments appears.
.The system displays a list of the selected work centers.
.The system displays the newly created line segments in the screen section Node area.
Depending on the default settings, the system inserts the new line segment under or beside the line segment. You can change these settings under Edit ®
and finally drag a connection line from the higher level line segment to the line segment that you want to assign.The system defines the feeder production line and indicates it by broken lines and broken connection lines.
This takes you to the display mode of the work center.
.You can display the individual capacities of a line segment by expanding the nodes of the object tree. The individual capacities which are used for scheduling are displayed in red.
Result
You have created the line hierarchy by means of a graphic and have defined the feeder production lines. Now you can insert standard or sort buffers into the line hierarchy and if necessary you can define visualization segments, planning segments or capacity segments.