
Material Exchange in the Order Browser
Use
You exchange the material to a node of a multi-level BOM for a sales order item if you want to carry out different changes to a non-configurable assembly that is used on various levels in one of the multi-level BOMs.

If you want to exchange the material of a configurable assembly, you use the instantiation in variant configuration. An instantiation is then particularly necessary if you have configured material BOMs differently to various nodes, and now want to fix. You can find further information about instantiation in
Material exchange is necessary, is an assembly is used on more than one node and you
Prerequisites
The BOM whose header material you exchange, must be a material BOM.
The superior BOM, that means the BOM that contains the components to be exchanged, has to be an order BOM.
If you work with variant configuration, we recommend that you close the configuration before you start the material exchange. You
instantiate configurable assemblies in variant configuration.Features
The system creates a new material master record and for the selected nodes an order BOM. Consequently, data is copied from the original material master record and items are copied from the original BOM.
You can select the scope of the data to be copied: