
Shipment and Transportation Scheduling
Purpose
The processes described below are used for shipment and transportation scheduling.
Process Flow
You can use the CIF integration model to specify whether an availability check for a material is performed in SAP APO or locally in the SAP R/3 system. You can make this setting separately for each combination of material/plant. If an availability check for a material/plant is performed in the SAP APO system, then any shipment or transportation scheduling is also performed using the SAP APO shipment and transportation scheduling. SAP R/3 shipment and transportation scheduling is not used in this situation.
We need to differentiate between the following scenarios:
The following are consequences with reference to shipping and transportation scheduling:
To ensure consistent scheduling in cross-system processing, scheduling takes place in the APO system. This is realized by a new function in APO. This function is different from the scheduling used in the standard system.
Mostly the same. However, scheduling is performed using the new APO function in the APO of the supplying system.
For more information, see the documentation for SAP APO – Advanced Planner and Optimizer in the section Supply Chain Management (SCM) Business Scenarios ® APO Shipment and Transportation Scheduling.
You can make the settings for shipping and transportation scheduling in Customizing for Advanced Planner and Optimizer (APO) under Global Available-To-Promise Check (Global ATP Check) ® Transportation and Shipment Scheduling.