Entering content frameProcedure documentation Maintaining Reference Points in the Bill of Material Item Locate the document in its SAP Library structure

 

Prerequisites

You have defined reference points in Customizing the Project System under Material ® BOM transfer.

Procedure

  1. Choose Logistics® Production ® Master data ® Bills of material ®Bill of material ® Material BOM, Order BOM, or WBS BOM® Create or Change.
  2. Enter the relevant data on the initial screen and choose This graphic is explained in the accompanying text.
  3. The item overview appears.

  4. Go to the detail screen of the item by double-clicking on the relevant item number.
  5. Enter a reference point in the Basic data tab page. You can only enter reference points that have been defined in Customizing for the Project System.
  6. Save the BOM.

Note

 

 