Entering content frameProcedure documentation Creating a Base Layer Locate the document in its SAP Library structure

Note

When large volumes of data are involved, you should only update LIFO data using background processing.

Procedure

To create base layers, proceed as follows:

  1. Choose Valuation ® Balance Sheet Valuation ® LIFO Valuation ® Prepare ® Create Base Layer. The system displays the selection screen.
  2. Enter the materials and pools for which the system is to create a base layer.
  1. Select the values that are to be used to determine the layer value. You can choose from previous month, month before last, previous year, and year before last.
  2. Select Create Base Layer if you want to update the database.
  3. Select Archive if you want to have the list of base layers optically archived.
  4. Choose This graphic is explained in the accompanying text Execute.

Result

The system displays a list of materials and pools along with the quantities and values.

See also:

Preparation of LIFO Valuation

LIFO Valuation

Balance Sheet Valuation (MM-IM-VP)

Leaving content frame