Special Planning Processes
Subcontracting
Subcontracting Procedure
Subcontracting with Production Version
Planning Components to be Provided
Direct Production
Planned Orders for Direct Production
Customizing Settings for Direct Production
Direct Procurement
Copying the BOM Long Text
Account Assignment for Direct Procurement Purchase Requisitions
Planned Orders for Direct Procurement
Message Transmission in Direct Procurement
Customizing Settings for Direct Procurement
Storage Location MRP
Planning Storage Location Stock Separately
Excluding a Storage Location from MRP
MRP Area
Examples for Planning with MRP Areas
Implementing MRP Areas
Preparing for Material Requirements Planning with MRP Areas
Converting the Planning File Entries
Planning File Entries for MRP Areas
MRP Area Segments in the Material Master
Maintenance of Mass Data
Planning Material Requirements with MRP Areas
Material Requirements Planning with MRP Areas
Determining and Assigning Storage Locations to the MRP Area
Determine Source of Supply for Delivery Schedules for MRP Areas
Planning Components for a Production Line (Example)
Planning for Components to be Provided in Subcontracting
Stock Transfer of Components to be Provided
Subcontracting/Third-Party Order Processing
Multi-Level Subcontracting (Example)
Stock Transfer from Plant to MRP Area
ATP Check with MRP Areas
Multi-Plant/Site Planning
Stock Transfer from Plant to Plant
Planned Orders for Stock Transfer
Withdrawal from Alternative Plant
Production in Alternative Plant
Customizing Settings for Multi-Plant/Site Planning
Requirements Grouping for Individual Project Planning
Grouping WBS element
Preparing Requirements Grouping
Create Project Definition and WBS Element for Grouping Element
Assigning WBS Elements to a Grouping WBS Element
Assigning MRP Groups to a Grouping WBS Element
Planning Material Requirements with Requirements Grouping
Automatic Requirements Grouping Within a Project
Multi-Plant Requirements Grouping with Single Grouping Element
Multi-Plant Requirements Grouping with Grouping WBS Elements
Requirements Grouping with a Grouping WBS Element for Each Plant
Requirements Grouping with Grouping WBS Elements for Each Plant
Grouping with Hierarchically Structured Grouping WBS Elements