Entering content frameProcedure documentation Creating a Single Cycle Plan Locate the document in its SAP Library structure

  1. Choose Logistics ® Plant Maintenance ® Planned Maintenance ® Maintenance Planning ® Maintenance Plans ® Create ® Single Cycle Plan.
  2. You reach the screen for creating a maintenance plan.

  3. Enter the maintenance plan category and choose This graphic is explained in the accompanying text.
  4. You reach the initial screen for creating a single cycle plan.

  5. Enter the necessary data.
  6. If you specify a performance unit for the cycle, the system automatically selects the first counter suitable for the reference object as a default value.

  7. Maintain the scheduling parameters if necessary on the tab Maintenance plan scheduling parameters.
  8. Note

    You can only maintain the scheduling parameters for the maintenance plan if you have entered a unit in the section Interval for the cycle. From the unit, the system can recognize whether the single cycle plan is performance-based or time-based and provides the corresponding scheduling parameters.

  9. Enter the necessary data for the maintenance item.
  10. You assign a task list if necessary to the maintenance item:
  1. Assign further technical objects to the maintenance item if necessary using the tab Object list (see Object List).
  1. If you want to create further maintenance items, choose This graphic is explained in the accompanying text with quick info Create MaintItem.
  1. Save the maintenance plan.

See also

Profile for a General Maintenance Task List

Defining a Default Value for a Maintenance Plan Category

 

Leaving content frame