Entering content frame alternative determination (PP)

Production Planning and Control (PP)

The system automatically determines which alternative in a multiple BOM is required with a multi-level BOM explosion.

The search process is controlled by the "application" entered and additional selection criteria as appropriate. The applications are defined in Customizing.

Leaving content frame