quantity structure (CO-PC)
|
The basis for calculating costs in a material cost estimate.
Typically, a quantity structure consists of a bill of material (BOM) and a routing.
In process manufacturing, a master recipe is used instead of a BOM. In repetitive manufacturing, a rate routing is used instead of a routing.
When you work in actual costing, the SAP System creates the quantity structure based on the actual data.