Entering content frame allocation structure (CO)

Controlling (CO)

A tool that allocates the costs incurred on a sender by cost element or cost element group.

The allocation structure is used for settlement and for assessment.

An assignment assigns a cost element or cost element group to a settlement or assessment cost element. Each allocation structure contains a number of such assignments.

The allocation structure must meet the following criteria:

For a settlement or assessment to be executed correctly, the allocation structure must represent all cost elements under which costs are incurred.

There must be only one cost element in an allocation structure.

Leaving content frame