Use
The PP-PDC interface is available as of release 4.6A. PP-PDC is an interface for R/3 Shop Floor Control. It is standardized for connecting subsystems used for entering time tickets and time events.
The interface used previously (as of release 3.0A) was called Communication Channel 2 (CC2). In comparison to the previous interface, the new interface includes an enhanced range of business functions. In addition, it has been implemented as an asynchronous SAP R/3 BAPI interface that functions without the transceiver.
Subsystems can take part in the SAP Complementary Software Program (CSP) for this interface.
For detailed information about this interface, refer to the certification documentation: R/3 Shop Floor Control: Plant Data Collection (PDC) PP-PDC.
Prerequisites
To execute the PDC data transfer, the following requirements must be met:
You maintain the communication parameters in Customizing for Shop Floor Control by choosing Operations ® Confirmation ® PDC Data Transfer ®
Features
Download
With the download function you can send data to a subsystem, so that input checks can be made in this subsystem. You need to download data to the subsystem to carry out checks in the subsystem. The following checks can be carried out at the subsystem level:
When the operations are downloaded, the operation data is transmitted to the subsystem. A
distinction is made between the following types of transmission:In the master data download the master data is downloaded to the subsystem, so that extensive checks can be carried out there. You can transmit the following data:
Task |
Program |
Menu path |
Download operations |
CIBDOP_DOWN_PP |
Logistics ® Production ® Shop floor control ® Confirmation ® Subsystem ® Download ® Download operations PP-PDC-4.6. |
Master data download |
SAPPPC22 |
Logistics ® Production ® Shop floor control ® Confirmation ® Subsystem ® Download ® Master data download. |
Upload
R/3 sends an upload request to the subsystem, asking it to transfer confirmation records to R/3.
With the upload function you transfer the confirmations from the subsystem to the R/3 system. You can set up the system so that either the confirmations are updated automatically after they have been transferred (see prerequisites) or the program CORUPROC1 is scheduled to do the update as a background job.
Task |
Program |
Menu path |
Upload request |
CIBDCONF_REQUEST |
Logistics ® Production ® Shop floor control ® Confirmation ® Subsystem ® Upload ® Request PP PDC 4.6 upload. |
Update |
CORUPROC1 |
Scheduling in the Background
The scheduling of the above-mentioned programs is prepared in Customizing for Shop Floor Control: Operations ® Confirmation ® PDC Data Transfer ® Schedule Background Jobs for PP-PDC.
Error Processing
In error processing, you can
reprocess confirmations for which errors occurred during updating.