Sequencing (PP-FLW)
Sequence Schedule
Creating Master Data
Creating the Line Hierarchy
Processing the Material Master
Example for Line Hierarchy
Executing Sequencing
Rates and Takt Times
Accessing the Sequence Schedule
Sequencing
Example for Sequencing
Takt-Based Scheduling
Takts
Example 1 for Takt-Based Scheduling
Example 2 for Takt-Based Scheduling
Example 3 for Takt-Based Scheduling
Example 4 for Takt-Based Scheduling
Dispatching, Deallocating and Rescheduling Manually
Changing the Planned Orders
Evaluating the Line Load
Changing the User-Defined Time Bucket
Changing the Operative Rate/Takt Time
Change the Rate/Takt Time
Changing the Planning Settings
Changing the Planning Settings
Medium-Term Planning Period
Selecting Line Segments
Defining Planning Segments
Defining Processing Profiles
Defining Planning Visualization Segments
Defining Visualization Segments for Planning
Defining Controlling Visualization Segments
Changing the Visualization Settings
Defining Order Characteristics (Customizing)
Assigning Order Characteristics
Changing the Visualization Profile
Line-On/Line-Off View of Orders
Changing the Graphic Display
Accessing the Control View