Procedure
You do not necessarily have to enter a material on this screen. For example, you can select all materials for one planer group or in one plant.
Note that the material cannot have the material type KMAT. The procurement type cannot be external procurement. The procurement type is on the MRP 2 tab page of the material master.
The system schedules the routings and produces a results list with the scheduling results.
Result
The system saves the scheduling results in the temporary file. You can update the relevant material master records now or later.