Entering content frameAssigning Splitting Rules Locate the document in its SAP Library structure

You can split schedule lines in the forecast delivery schedule from different time periods according to instructions and their various splitting rules. The system determines these periods based on splitting rule ranges.

To split a schedule line in a forecast delivery schedule, the system uses:

The system uses ranges with the date type week to split weekly schedule lines, and ranges with the date type month to split monthly schedule lines. Remember that daily schedule lines in a forecast delivery schedule are copied unchanged into the planning delivery schedule.

Because ranges are always defined from the base date, you may have several splitting rule ranges covering one schedule line date. For example, you may have splitting rules valid for two months, and for seven months from the base date. If both rules cover the schedule line date, the system uses the splitting rule with the shortest range, in this example two months.

If none of the ranges cover a schedule line date that lies within the validity period (for example if all the ranges have expired), the system copies the schedule line unchanged to the new planning delivery schedule.The same applies if a range has been specified but no splitting rule.

Note

The week (or month) of the base date is always counted as the first week (or month).

If you enter 0 for the range, the system takes the week or month previous to the base date as the range end date.

Example

This graphic is explained in the accompanying text

The base date of the planning delivery schedule is 04/02/98. This is a Thursday, week 14,1998.

Based on this date, the system determines the splitting rule range end dates. Schedule lines are split in the forecast delivery schedules as follows:

Caution

The splitting rule range specifies how long the delivery schedule splitting rule is valid.

The delivery schedule split validity period specifies the overall validity of the delivery schedule split.

Although both influence schedule line splits, the split validity period overrides the splitting rule range in every case.

In this example, if the split validity period has been set to seven months, generated schedule lines for week 45 with dates lying after the validity end date 10/31/98 are not included in the planning delivery schedule.

This graphic is explained in the accompanying text

 