Prerequisites
There are scheduling results for the material that you want to update in the temporary file.
You can copy the data from the temporary file to the material master record by using report program RCPMAU02.
Procedure
Result
The scheduling results are copied to the material master records and a log is produced. If you have scheduled a material several times, the scheduling results from only one scheduling run can be updated in the material master.