Use
You use this function to update material master records. in particular you replace the execution times (and possibly assembly scrap) in the material master by the execution times that were calculated in scheduling.
Features
The following times are updated: set-up., teardown, processing and interoperation times. The assembly scrap is also updated, if required. The base quantity in the material master record is also replaced by the scheduling lot size.
Updating Material Master Records
Updating material master records in two steps (see Updating Material Master Records graphic)
You can execute both of these steps either manually or automatically.
If you have entered a lot size independent in-house production time, it is set to zero after an update.
If assembly scrap has been entered in a material master record and you update the assembly scrap, the following applies: If scheduling does not calculate an assembly scrap value, then the assembly scrap value is overwritten with the value 0.