
Releasing New Objects
Prerequisites
You must have completed the required steps in:
Procedure
You should release the new segments first, then your basic type or extension.
You can set the release from the relevant development tool (IDoc type editor or segment editor) by selecting Edit ® Set release. The release can also be reset by selecting Edit ® Cancel release.

In the example, you should release the following development objects in the specified order when testing has been completed successfully:
If you have extended the basic type ORDERS01:
Segment |
Z1TEST1 |
Extension |
Z1ORDERS |
If you have defined the new basic type TESTER01:
Segments |
E1HEAD, E1ITEM |
IDoc type |
TESTER01 |
Result
Your new definition is now closed. If you still want to translate the documentation into your new definition, you can do this specifically with the general translation transaction. The following section deals with the objects that you need within the translation transaction:
Documentation Translation