Entering content frameProcedure documentation Assigning a Revision Level to a Material Locate the document in its SAP Library structure

How to assign a revision level:

  1. Process (create or change) the material BOM with reference to a change number.
  2. Go to an item overview, item detail screen, or header detail screen.
  3. Choose Extras ® New revision level.

The system checks that no revision level has been assigned to the BOM header material for this change number.

Save the BOM.

Leaving content frame