– In the Material field, enter the material for which you want to create a variant.
– In the Plant field, enter the plant in which you want the variant to be valid.
The BOM that you want to use to create a variant must exist in this plant.

You can extend the area of validity of the BOM later on by using the Create plant allocation function.
– Enter the Usage.
If a default parameter is defined for the Usage field in your user master, you see this value. Otherwise you see the usage that was last entered in this field.
When you select a usage, please note that the usage determines which item statuses you can set. This means that you can only maintain certain indicators (for example, relevant to production, relevant to costing) at item level.
The material that you want to use to create a new variant in the selected plant must already have a BOM with the usage that you enter here.
– Do not make an entry in the Alternative field, for a variant BOM.
In a variant BOM, the alternative is not relevant to the user. The alternative is only required internally for storing the variant BOM. For this reason, if you do make an entry in the Alternative field, the system ignores your entry.
See also:
Maintaining the Create Material BOM Initial Screen
If you create the variant with reference to a change number, the entire BOM group (this includes all variants of the variant BOM) has a history requirement.
This means that you can only change or extend the BOM if you enter a valid change number.