Entering content frameConceptual documentation Before You Create New Items Locate the document in its SAP Library structure

Before you can enter a BOM item, certain requirements must be met.

Entering Material Components

Before you can enter material components, the following requirements must be met:

Note

If the BOM is for plant maintenance purposes only, the system does not check for plant data, so you can create a BOM for a material with reference to a plant, even if no plant data is maintained for the material.

Note

If you do not enter a unit for an item with a material master record, the system enters a unit from the material master record:
If a unit of issue is entered on the Work scheduling 1 screen or the Storage screen, the system uses this unit. Otherwise, the system uses the base unit of measure.
For non-stock items without a material master record, the system proposes the component unit of measure
PC (piece).

See Item Categories for Material Items.

Entering Document Items

Before you can enter document items, the document must have a document info record. The document must not be marked for deletion.

See Document Item.

Entering Class Items

Before you can enter a class item, the class must exist in the system. For a configurable BOM, the class type must be defined for configurable objects (for example, 200 – configurable materials, 201 – configurable documents).

See Class Item.

In the additional data of class maintenance functions, there are several fields that control the use of the class in BOMs.

See Class Data.

Example

You enter the unit of measure meter (dimension length) in class maintenance. When you enter the class as a class item in a BOM, you can also enter the units of measure millimeter or centimeter (also dimension length) in the BOM item.

 