Entering content frameFunction documentation Special Features In The Definition Of Cost Element Reports For Projects Locate the document in its SAP Library structure

Use

Defining project reports requires several special settings.

Note

You can also display actual line items for WBS elements. Choose the CJ62 transaction for this. The system provides you with all the functions of the line item report.

Prerequisites

Result

When you run a project report, the system selects the project hierarchy via the logical database for the project system. It then transfers this to the group variable for the OBJNR characteristic used in the report. Therefore, the system does not create an entry field in the selection screen for this variable.

Leaving content frame