PP KANBAN
PP - KANBAN
KANBAN Versus MRP Material Requirements Planning
KANBAN Procedure
Classic KANBAN
Event-Driven KANBAN
One-Card KANBAN
KANBAN with Quantity Signal
KANBAN Replenishment: With or Without MRP
Storage Location Assignment for KANBAN
Storage Location and Supply Area Determination in BOM Explosion
KANBAN Without MRP
KANBAN With MRP
Master Data for KANBAN
Supply Area
Define the Supply Area
Person Responsible for KANBAN
Control Cycle
Creating/Changing Control Cycle for Classic KANBAN
Defining the Replenishment Strategy in the Control Cycle
Defining the Automatic Kanban Calculation in the Control Cycle
Creating/Changing Control Cycle for Event-Driven KANBAN
Replenishment Strategy
Create Replenishment Strategies
Change Replenishment Strategies
Automatic Kanban Calculation
Carrying Out the Automatic Kanban Calculation
Checking and Copying the Automatic Kanban Calculation
Accessing the Error Log
Calculating Depndt Reqmts for Automatic Kanban Calculation
Smoothing the Dependent Requirements
Calculating Replenishment Lead Time and Converting Requirement
Calculating the Number of Kanbans/Kanban Quantity
KANBAN Control
Status Change/Kanban Signal
Status Sequence
Triggering the Kanban Signal
Trigger Kanban Signal for Event-Driven KANBAN
Trigger the Quantity Signal
One-Card KANBAN / Special Logic for Triggering Kanban Signal
Mobile Data Entry for KANBAN
Backflush
Backflushing
Separating the Status Change from the GR Posting
Independent Supply Source/Separation of Status Change and Replen
The Kanban Board
The Kanban Board from Demand Source View
The Kanban Board from Supply Source View
User Exit for Customer-Specific Fields in the Kanban Board
Error Handling
Kanban Correction
Correcting the Kanban
Printing and Circulating Kanbans
Set to Single Kanban Print
Set to Regular Kanban Print
Collective Kanban Print
Print Kanbans Collectively
Sending EDI Messages
Replenishment Strategies
Replenishment Strategies for In-house Production
Replenishment Using Manual KANBAN
Replenishment Using Run Schedule Quantities
Replenishment Using Production Orders
Kanban Control: In-House Production
Replenishment Strategies for External Procurement
Replenishment Using Standard Purchase Orders
Replenishment Using Stock Transfer Orders (Plant to Plant)
Replenishment Using Scheduling Agreements
Replenishment with Summarized JIT Calls
Creating and Transmitting a Summarized JIT Call
Determination of Delivery Date
Grouping Kanbans to a Summarized JIT Call
Example for Summarizing According to Delivery Date
Create a Summarized JIT Call
Structure of the Message Determination
Example for Message Determination at External Procurement
Creating Message Condition Records
Transmit a Summarized JIT Call
Display or Change a Summarized JIT Call
Access Collective Display of Summarized JIT Calls
Example for Summarized JIT Call
Goods Receipt with Summarized JIT Call
Archiving Summarized JIT Calls
Archiving and Deleting Summarized JIT Calls
Replenishment Using Source List
Kanban Control: External Procurement
Replenishment Strategies for Stock Transfer
Replenishment Using Reservation
Replenishment Using Direct Transfer Posting
Replenishment with WM Based Storage Locations
Transfer Posting Using Replenishment Elements from MRP
Replenishment of WM-Managed Storage Locations
Additional KANBAN Processes
Cross-Plant KANBAN
Procurement and Withdrawal to Cost Center
KANBAN with SD Delivery
Cost Accounting for KANBAN
Product Cost Collector
Editing Product Cost Collectors
Standard Cost Estimates
Material Cost Estimate with Quantity Structure
Cost Estimate with Quantity Structure: Process Flow
Preliminary Cost Estimates for Product Cost Collectors
Creating Preliminary Cost Estimates for Product Cost Collectors
Cost Object Controlling: Make-to-Stock Production
Product Cost by Period
Product Cost by Order
Evaluations
Plant Overview
Accessing the Control Cycle and Kanban Overview
Displaying Errors
Confirmations to PP-PK (CC5)
Record Types
Customer-Specific Enhancements
KANBAN on the Internet (PP-KAB-CRL)