Entering content frameBackground documentation Activity Type Master Data Locate the document in its SAP Library structure

You can maintain the master data of activity types using time-based dependencies (see: Time-Based Dependencies of Master Data). The following time-based dependencies are possible in the SAP-R/3-System:

The following table shows the activity type master data according to time dependency:

Time-Independent and Time-Based Master Data for Activity Types

Time-independent fields (I)

Fiscal-year based fields (Y)

Period-based fields (P)

Day-based fields
(D)

None

Basic data

None

Basic data

 

Activity unit

 

Name

 

Activity type category

 

Description

 

Actual activity type category

 

Cost center categories

 

Allocation cost element

   
 

Output

   
 

Output unit

   
 

Output factor

   
 

Indicator

 

Indicator

 

Price Indicators

 

Lock indicator

 

Actual price indicator

   
 

Average prices

   
 

Predistribution of fixed costs

   
 

Plan quantity set

   
 

Actual quantity set

   

 

The following table shows:

Activity Type Master Data

Field

Use

Time base

Basic data

   

Name

Name of activity type

D

Description

Description of activity type

D

Activity unit

Unit of measure in which the activity is allocated

Y

Cost center categories

Cost center categories for which the activity types is valid for planning and allocation

D

Activity type category, Actual activity type category

Defines whether, and how, the activity type is to be entered and allocated (default value)
(see:
activity type categories)

Y

Allocation cost element

Secondary cost element, under which the activity type is allocated (default value, can be overwritten in activity type planning)

Y

Price indicator,
Actual price indicator

Defines how the price of the activity type is to be calculated on a cost center (default value)
(see:
price indicators)

Y

Average prices

Defines whether the prices of cost centers/activity types remain constant for the complete fiscal year (default value) (see: Structure link procedure for price calculation))

Y

Predistribution of fixed costs

Determines whether or not fixed costs are to be distributed in advance to the cost centers receiving the activity (default value) (see: Structure link predistribution of fixed costs).

Y

Plan quantity set

If you set this indicator, the planned activity quantity is not changed by plan reconciliation - even where planning for the object is not to be reconciled.

Y

Actual quantity set

Determines whether, in addition to the allocated activity type quantity credited to the cost center, you can also post a manual quantity (default value)

Y

Indicator

   

Lock indicator

Locks the activity type against the planning of activity inputs

D

Output

(See also: Example)

 

Output unit

Alternative output unit

Y

Output factor

Alternative output factor

Y

 

You can specify an alternative output unit if the output of the activity type is measured in a different unit from that used by the activity type itself.

Example

One hour of the activity "Lathing" produces 10 drills. The activity unit is "Hour", the alternative output unit is "Piece". You can also specify an output factor, in this case "10".

The system is able to automatically derives the output from the scheduled activity, using the alternative output unit and the alternative output factor.

 

Note

You can add user-defined additional fields to activity type master data. To do this, use the enhancement COOMLA01 Activity type: User-defined additional fields in the master data record. You can maintain the additional fields on a tab page in the relevant individual processing of the master data. You can use these additional fields to select master data in selection variants for deletion or for list display

You create additional fields in Customizing (IMG) for Cost Center Accounting. Choose Master Data ® Activity Types ® Program Enhancements for Activity Type Master Data .

For more information on enhancement COOMLA01 see the documentation for the enhancement. You can display the documentation if you assign the enhancement to a project in the enhancement transaction CMOD.

For more information on procedure for enhancements, see BC - Changes to the SAP Standard.

 

 

 

 

 

 

 

Leaving content frame