Processing the Technical Check 
Use
After the goods receipt has been posted, execute a technical check of the devices, based on the goods receipt posting of the inspection lot created. In the framework of this check, you will decide what operations are necessary in the further run of the repairs processing.
Procedure
Menu Path |
From the Service Processing node, choose Order ® Inspection Processing ® Usage Decision ® Enter |
Transaction Code |
QA11 |
Field |
Data |
UD Code |
A |
Field |
Data |
To blocked / Repair |
3 |

The technical check made clear that all devices send by the customer by the customer, can be repaired. Therefore, you post 3 pieces of equipment from the stock in quality inspection into a blocked repair stock.
You can see that the serial numbers of the devices have been transferred to the inspection lot.