Use
A pre-requisite for executing this process is the activation of QM inspection type 05 (inspection for other goods receipt) in the material master of used material R-1001. This is done within this step.

So that the run of other IDES processes using material R-1001 is not impaired, it is important to process Deactivating the QM Check even if you finish it early. If you set up a stock in quality inspection already, due to the goods receipt of the equipment to be repaired, it is necessary to execute the process step Processing the Technical Check as well. Here, the stock in quality inspection is reduced. A deactivation of the inspection is only possible if the system contains no stock in quality inspection.
Procedure
Menu Path |
Logistics ® Quality management ® Quality planning ® Logistics Master Data ® Material ® Change |
Transaction Code |
MM02 |
Field |
Data |
Material |
R-1001 |
Field |
Data |
Quality Management |
Select |
Field |
Data |
Plant |
1200 |
Field |
Data |
Active (in the line inspType 05) |
Select |