Additional Process Information 

You manually create an inspection lot for the subsequent inspection of material 300-130 in this process. The system automatically creates a sample-drawing instruction with several physical samples. The assigned sample-drawing procedure supports sample determination according to the number of containers using a sampling scheme. The number of primary samples to be drawn increases depending on the number of containers specified in the inspection lot. Mixed samples are not planned. The samples also do not need to be released manually. The system automatically sets the status.

You enter the results in the inspection lot using the sample number. You can then make the usage decision for the inspection lot.