Changing or Displaying the Operative Production Rate / Takt Time 
Use
Starting from the planning table, you can display and change the operative production rate/takt time you defined in Line Design. It makes sense to specify an operative rate if the production rate changes in the short-term for a certain period as then you do not have to change the planned production rate and takt times.
The operative production rate/takt time overrides the planned production rates and takt times in Line Design.
Procedure
Display
The system displays the dialog box Display Operative Rates / Takt Time. Here, the system displays the maximum production rate you may have maintained in the line hierarchy and the operative rates that you maintained in Line Design for certain periods.
Change
The system displays the dialog box Change Operative Rates / Takt Time.
Result
The system calculates the operative takt time using the specified operative production rate and uses this value for scheduling the planned orders that lie in the corresponding periods.