Results Analysis from the Inventory Accountant Viewpoint 
Use
As an inventory accountant you are concerned more with the inventory than revenue. You are, therefore interested in the result of the actual costing which provides you with amongst other things details about the material price history and the inventory value history. In addition to this, you can check if any incorrect entries have been made prior to a closing valuation.
Procedure
Menu Path |
Accounting ® Controlling ® Product Cost Controlling ® Actual Costing/Material Ledger ® Actual Costing ® Edit Costing Run |
Transaction Code |
CKMLCP |
Field |
Data |
Costing run |
CA 6000 |
Period |
007.2000 |
You will see that the costing run for the plants in Mexico City and Monterrey have been created.
You will see in the Successful column in the line Post closing that the costing run for all four materials selected has been closed successfully.
You can understand the flow steps on the basis of the status messages.
You can represent the results in various views and hierarchies and also display the material list with filters.
Field |
Data |
View |
Overview: Costing Run |
Hierarchy |
CstngRun/plant/mat. type/val. class/origin group |
You will note that of the four materials selected, three come from plant 6000 in Mexico and one from plant 6100 in Monterrey.
You will see that one finished product, one semi-finished product and one raw material have been selected in plant 6000.
Field |
Data |
View |
Overview: Costing Run |
Hierarchy |
Costing run/level/cycle no. |
All of the materials selected for which no postings have been created in the period are assigned level 0. All of the materials selected which do not have multi-level receipts are assigned level 1. All other materials are assigned according to their level in the production process.
In the selected setting you will see that of the four materials, two are assigned to level 1, one is assigned to level 2 and one to level 3. Postings are created for all materials which are intended for the actual costing (material price determination 3)
Moreover, you will notice that two materials do not have multilevel receipts, meaning no multilevel price determination is necessary, recogizable by the minus sign in column P (multilevel price determination).
Field |
Data |
View |
Single-level price determination |
Hierarchy |
CstngRun/plant/mat. type/val. class/origin group |
Single-level price determination is carried out for all materials selected and is a prerequisite for both the mulitlevel price determination and the closing entries.
You can see that single-level price determination has been carried out successfully (which you can recognize by the green traffic light or the green column).
Field |
Data |
View |
Multilevel price determination |
Hierarchy |
Costing run/level/cycle no. |
You see that the multilevel price determination has been carried out successfully for the materials for levels 2 and 3.
Field |
Data |
View |
Multilevel price determination |
Hierarchy |
CstngRun/plant/mat. type/val. class/origin group |
You see that in both plants respectively one material has been costed multi-level.
Field |
Data |
View |
Closing entry |
Hierarchy |
CstngRun/plant/mat. type/val. class/origin group |
You will see that the closing entry for all of the materials selected has been performed successfully.
Field |
Data |
View |
Overview: Costing Run |
Hierarchy |
CstngRun/plant/mat. type/val. class/origin group |
You see a list of all the appropriate materials. This is a further detailed display of the results you have already analyzed.
You receive the variances from each material between the preliminary valuation price and the periodic unit price. The list is sorted according to the percentage variances. You can now see, at a glance, the materials for which you need to carry out a more detailed price analysis.
The material with the greatest percentage variance is in this case the labels for the CD’s, so you must now carry out a detailed analysis.
The Material price analysis screen appears.
You will see in the Price column that the price of both the period beginning inventory and that of the receipts is higher than the planned price.
You will see that the goods receipt was posted without price differences and conclude that the price used in the purchase order was the preliminary valuation price.
In addition you will notice that the price differences arise upon receipt of the invoice, meaning the vendor has entered a higher amount in the invoice than agreed in the purchase order.
The material with the second highest variances is the completed demo CD’s.
You will notice that the variances for the most part originate in the external procurement. However, since you are interested in a more detailed analysis, you also examine the causes of the variances for production.
You see three documents:
You will see that the price determination has settled price differences for the material components, the cost centers and Activity-Based Costing to the demo CD’s. It is clear that the two items Blank CD (material component) and Recording CD (activity type) are responsible for the greater part of the price differences.
For the manufacture of 800 demo CD’s, 900 blanks have been used.
You will see that the cause of the price differences is the delivered price for purchase order with vendor Productos Argentinos.
, until you return to the document for multilevel price determination.To manufacture the 800 demo CD’s required a further 8.5 hours of activity type Recording CD. You recognise differences that have been allocated to the demo CD’s through the variances between the actual price and the plan price.
Result
This leads you to conclude that the price of the demo CD’s is higher than planned due to higher costs for the blank CD’s and higher activity prices for recording them.