Executing the Measuring Point Analysis 

  1. Use the following procedure to call the transaction:
  2. Menu Path

    From the Equipment node, choose Display

    Transaction Code

    IE03

    The system defaults the electric pump 006 as the equipment.

  3. Choose .
  4. Choose Measuring points/counters.
  5. Select the measuring point for the operating hours.
  6. Choose Measurement documents.
  7. The Measuring point field, contains the value of the measuring point you selected.

  8. Choose .
  9. You see a list of all the measuring documents with date and measurement readings.

  10. Choose .
  11. Choose Measurement documents.
  12. The system displays a scatter chart containing the values of the measuring point.

  13. Choose Global options.
  14. Change the time unit, for example Calendar weeks.

  15. Choose Continue to return to the scatter chart.
  16. Do not leave this screen.

This information is useful when you analyze the performance history of the equipment.