Assigning Materials from the Bill of Materials 

  1. Choose List to assign the required components from the structure list to the operation.
  2. Choose Expand whole.
  3. Select the component DG-1000 – Rubber Seal, 34 x 4 and choose .
  4. To determine if the required quantity is available for the scheduled date, choose .
  5. The material for the date is confirmed on the Confirmation proposal screen.

  6. Choose Continue.
  7. Choose Header data.
  8. Do not leave this screen.