Entering the Malfunction Report 

Use

In this process step a malfunction occurs that prevents a pump of construction type Pump GG Etanorm 200-1000 from functioning correctly. In a later process step, you will replace this defective pump with one of the new pumps held in the warehouse.

Procedure

  1. Use the following procedure to call the transaction:
  2. Menu Path

    From the Management of Technical objects node, choose Functional Location ® Structural display

    Transaction Code

    IH01

  3. Enter the following data:
  4. Field

    Europe

    North America

    Description

    Functional location

    K1-ZPW

    C1-ZPW

    Inlet pump plant

    Levels below

    9

    9

     

    Equipment installed

    Select

    Select

     

    Equipment hierarchy

    Select

    Select

     

    As graphic

    Select

    Select

     
  5. Choose .

The system highlights in color the structure of the functional location and the installed pieces of equipment.

  1. Select the blue rectangle of the following functional location:
  2. Field

    Europe

    North America

    Description

    Functional location

    K1-ZPW-2

    C1-ZPW-2

    Inlet pump plant - screening plant

  3. Choose Goto ® Create notification ® Malfunction report.
  4. Choose Notification.
  5. Enter the following data:
  6. Field

    Europe

    North America

    Description

    Short text

    Wave break

    Wave break

     

    Breakdown

    Select

    Select

     

    Damage

    PM01

    PM01

    General damage

     

    1000

    1000

    Broken

  7. Choose .
  8. Choose .
  9. Choose until the overview tree appears.

Result

You have now entered a malfunction report and reported the breakdown of a pump in the inlet pump plant.