Creating Single-Level Work Breakdown Structure BOMs 

Use

You require a BOM in order to plan and produce a production lot and to determine its costs. You can use an existing material BOM, create a work breakdown structure BOM for each individual production lot or you can use one work breakdown structure BOM for several production lots of a material.

Prerequisites

You have Created Production Lots and maintained the necessary control data during the creation.

Features

The components of material or work breakdown structure BOMs, which have already been created, can be copied and adopted in the initial screen.

Activities

  1. In order to create a single-level work breakdown structure, starting from the bills of material menu, you choose: Bill of material ® WBS BOM ® Single-level ® Create.
  2. The initial screen appears.

  3. Enter the necessary data, like, for example, the WBS element, the material and the usage for the material.
  4. Choose Enter. The Material Item Overview screen appears.

  5. Enter the item categories, the components and the quantity.

Save your data.

 

To change or display the single-level work breakdown structure BOM, starting from the Bill of material menu, you choose: Bill of material ® WBS BOM ® Single-level ® Change or Display.