You must maintain the following fields in the MRP data for production lot planning with individual project stock:
- You enter the planning strategy in the strategy group field.
- In the MRP dep.requirements field, you set the indicator to 1 so that dependent requirements (reservations) are not planned.
- You do not set an indicator in the Cross-project field for the availability check. This means that only the individual segment (segment of the production lot) is checked during the availability check.
- In the Individual/coll. field, you set the indicator to 1 for Individual requirements only.
You must maintain the following fields in the MRP data for production lot planning with transfer posting to plant stock:
- You enter the planning strategy in the strategy group field.
- In the MRP dep.requirements field, you set the indicator to 1 so that dependent requirements (reservations) are not planned.
- In the cross-project field, you set the indicator to 1 for the availability check. This means that all segments (there is one segment for each production lot) are checked together during the availability check.
- In the Individual/coll. field, you set the indicator to 2 for Collective requirements only.