Order BOMs (PP-BD-BOM)
   Order BOM
   Hints on Terminology
   Sales Order Processing for Products with Many Variants (Desc.)
      Sales Order Processing for Products with Many Variants (Struct.)
   Sales Order Processing with Engineer-to-Order Production
   Assemblies with a Long Replenishment Lead Time
      Detached Order Assembly
         Example: Detached Order Assembly
      Create Detached Order Assembly
      Inserting a Detached Order Assembly
   Entering a Sales Order
      Blocking Requirements
   Creating an Order BOM
   Order BOMs for Variant Configuration
      Example: Order BOMs in Variant Configuration
      Settings in the Configuration Profile
      Creating a Knowledge-Based Order BOM
      Creating a Result-Oriented Order BOM
         Instantiating Configurable Materials
      Fixing Configurable Assemblies
         Merging with Global Material BOMs
   Order Browser
      Creating Order BOMs without Configuration
         Create an Order BOM
         Example: Creating Without Variant Configuration
      Working with the Order Browser and Order Analysis
      Navigation in the Order Browser
         Calling up the Browser
         Variable Display Depth
         Display Log
      Engineering Change Management in the Order Browser
      Order Analysis
      Material Exchange in the Order Browser
         Material Exchange
      Fixing a BOM in the Order Browser
         Fixing a BOM in the Order Browser
         Example: Multi-Level Fixing in the Order Browser
      Multi-Level Copying
         Copying a BOM Level by Level
      Order BOM Editing
         Changing an Order BOM
         Displaying Order Bills of Material
      Transferring BOMs to the Project System
      Multi-Level Order BOM Reporting
         BOM Explosion
            Displaying BOMs Level by Level
            Displaying a Multi-Level BOM Explosion
            Displaying a Summarized BOM
         Where-Used Lists
         BOM Comparison
   Order-Specific Component Assignment in Routings
   Costing of Order BOMs
      Sales Order Costing
         Product Cost Estimates for Sales Order Items
         Manually Creating a Product Cost Estimate for a Sales Order Item
      Order BOM Cost Estimates
         Order BOM Cost Estimates
            Creating and Marking an Order BOM Cost Estimate
   Blocking Requirements
   Order BOMs in MRP
      Plan Material Requirements for Detached Order Assemblies
      Plan Material Requirements for Sales Order Items
   Order BOMs in Production
   Enhancements to the SAP Systems in the Area of PLM
      Enhancements in Document Management
         Enhancements using Customer Exits (Document)
            Finding Recipient Lists (EXIT_SAPLCVV1_001)
            Screen: Basic Data for Maintaining Documents
            Screen: Recipient Lists (EXIT_SAPLCVV1_002)
            Determine Original Application File (EXIT_SAPLCVV1_003)
            Document Part and Version (EXIT_SAPLCVV1_004)
            Create Distribution Order (EXIT_SAPLCVV2_001)
            Check Part Order (EXIT_SAPLCVV2_002)
            Create Initial Order (EXIT_SAPLCVV2_003)
            Determine Context (EXIT_SAPLCVV5_001)
            ITS Access (EXIT_SAPLCVVW_001)
            Determining the Application (EXIT_SAPLCVV1_005)
         Enhancements using Business Add-Ins (Document)
            Checking Authorization from the Document Management Systems
            Processing of Original Application Files
            General Document Processing
            General Document Processing (II)
            Status checks
            Transport of Original Application Files
            Checking the Attributes of the Document Key
            Filter for DMS processes
            Enhancements for Internet Scenarios
            Enhancements for Microsoft Office integration
         Enhancements using User Exits (Document)
      Enhancements Using Customer Exits (Material Master)
      Enhancements in the Area Engineering Change Management
      Enhancements in BOMs
         Enhancements Using Customer Exits (BOMs)
         Enhancements using Business Transaction Events (BOMs)
            Update of a BOM (CS000010)
      Enhancements in the Classification System
      Enhancements in Variant Configuration
   WBS BOM Browser
      Navigation in the WBS BOM Browser
         Calling Up the Browser from the Project Info System
         Calling up the Browser
         Variable Display Depth
         Display Log
      Analysis
      Material Exchange in the WBS BOM Browser
         Material Exchange
      Fixing a BOM in the WBS BOM Browser
      Processing a Single-Level WBS BOM
      BOM Transfer