Data for This Example 

Field

Data

Description

Strategy

B

Key date scheduling

Description

Calibrate multimeter

 

Equipment

10003540

Multimeter, analog

Planning Plant

1000

Plant - Hamburg

Planner group

102

Hr. Wenzel

Order type

PM06

Calibration order

Main work center

5001

Electrical maintenance

Business area

7000

Electronic products

Call horizon (%)

90

 

Scheduling period

365

 

Cycle start

One month before today’s date

 

Task list type

A

General task list

Group

30

 

Group counter

1

 

Insp. lot origin

14

Plant maintenance

Mean value

-0,4

Result value for the characteristic Variance from zero.

 

100,2

Result value for the characteristic Display at end of scale.

UD Code

A1

Usage decision code: Usable with standard follow-up action

Actual work

0,5

Time required for the first operation

Final confirmation

Select

Indicator for final confirmation of the first operation

Actual work

1,0

Time required for the second operation

Final confirmation

Select

Indicator for final confirmation of the second operation

Actual work

No entry

Time for the third operation equals zero, because the measuring instrument now functions correctly

Final confirmation

Select

Indicator for final confirmation of the third operation

Settlement period

Current month

 

Test run

Deselect