Pegged Requirements 

Use

You can use the Pegged requirements function to retrace from any BOM level

Features

For the MRP element selected, you can display:

The system displays the requirements quantity and the input quantity for each requirement. The input quantity is the portion of the MRP element that is required to cover the displayed requirement. The input quantity is displayed in the base unit of measure of the material.

If an MRP element contains a quantity that was not caused by a requirement from a higher level, the system displays this quantity separately. Quantities without source arise, if more is produced than is required because of a rounding value for the lot size or a fixed lot size or if procurement proposals have been scheduled manually.