Using Individual Access for Planning Result/Planning Situation 

  1. From the MRP or MPS node, choose Evaluations ® Planning result or Planning situation material.
  2. The system displays the initial screen for the respective evaluation.

  3. Enter the material, the plant, (if MRP areas have been activated on a client basis) the MRP area and the layout.
  4. Choose twice.

The system displays the overview screen for the evaluation selected.