Using Individual Access for Planning Result/Planning Situation
From the MRP or MPS node, choose Evaluations
®
Planning result or Planning situation material.The system displays the initial screen for the respective evaluation.
Enter the material, the plant, (if MRP areas have been activated on a client basis) the MRP area and the layout.Choose twice.
The system displays the overview screen for the evaluation selected.