The system displays the planning result for the header material where you can make changes to the material. You can call up the planning result for the next material (component) by choosing .
Double-click on a material in the material list to access the planning result of an individual material.
The system displays two additional columns in the planning result: the Exception lower level column and the Delay column.
In the Exception at lower level column, the system displays the numbers of the exception messages that appear for the MRP elements in lower BOM levels. The system displays the number of days an MRP element is delayed in the Delay column.
The system displays the descriptive text for the exception message in the status line. To access further information about the message, double-click the status line.
The dialog box Order structure of MRP element appears.
In the dialog box, the system displays all MRP elements belonging to the lower-level components with the exception messages that belong to them.
The planning result for the selected component now appears. The system also displays the details for the selected MRP element in the lower screen area so that you can make changes.
The system transfers the changed data. The changed MRP element is firmed automatically.
The system executes the planning run for the changed material and the lower BOM levels again.
Your planning results are saved in the database. If you exit this transaction without saving, your planning results are lost.