Working with the Material List 

Use

You can use the material list directly after the planning run to

Prerequisites

You have selected the Display material list field in the initial screen for the single-item, multi-level planning run and started the planning run.

Procedure

  1. Double-click on the required material.
  2. The system displays the planning result for this material. It cannot be changed.

  3. Choose .
  4. You can now change the planning result.

  5. Process the planning result as desired.
  6. For more information about the processing options, see Working with the Planning Result under Procedure.

  7. Choose .

The changes are immediately passed on to the dependent materials.