Example for Calculating Statistical Range of Coverage 

Example Data for Average Daily Requirement

Requirement for 1st period

1000

Requirement for 2nd period

2000

Calendar period

Week

Period length

Standard days (5 days)

Number of periods

2

Example Data for Determining the Range of Coverage

Target range of coverage for period 1

2 days

Period 1

2 weeks

Target range of coverage for period 2

4 days

Period 2

3 weeks

Calculation

(1000 + 2000)/(2*5) = 3000/10 = 300

Average requirement * range of coverage in period 1
300 * 2 = 600

Average requirement * range of coverage in period 2
300 * 4 = 1200

Result

For the first two weeks starting from the MRP date, a safety stock level of 600 pieces is planned.