Adapting the Revision Level if Dates Change
Use
If you change the dates of a planned order, the order start date will be moved to another revision level if necessary. In order to make the changes to the revision level effective, you must trigger the BOM explosion for this planned order manually.
Prerequisites
You have maintained revision levels for the material.
Procedure
In the planned order, you choose Edit
® Explode BOM.During the BOM explosion, the system determines the valid revision level using the explosion date of the planned order.