Levels of Scheduling
Use
The scheduling level defines which scheduling data will be used for lead time scheduling.
Integration
You use rate-based scheduling in repetitive manufacturing.
You use rough-cut scheduling in demand planning and preliminary planning.
Features
You can carry out lead time scheduling at three different levels:
You can also define additional parameters for detailed scheduling such as reduction, and the scheduling type (backward, forward) in Customizing for MRP.
In MRP, you usually use the detailed scheduling procedure.