In-House Production Time: Dependent on Lot Size
Use
You use lot size dependent in-house production time if the processing time controls production to a greater extent than the lot size independent times, for example, queue time or setup time.
Prerequisites
You have maintained the following times in the material master (Work scheduling view):
Features
The setup time is the number of days that are necessary to set up and tear down machines that are required to process the material.
The interoperation time is the sum of the wait times, queue times and move times as well as the float before and after production.
The system determines the lot size dependent in-house production time from both times depending on the lot size in the order.
The floats (for example, float before production, float after production) are not included in the calculation of the in-house production time, but actually form part of the in-house production time. The total floats are maintained through the interoperation time.