Operation Scrap 

Use

Before high-value components are built into an assembly, the system carries out a quality control check of the assembly, if necessary. Faulty materials that were taken into account in assembly scrap are not passed on to the next operation. They are removed.

Therefore, for a high-value component, you plan using operation scrap instead of general assembly scrap.

Prerequisites

You have maintained the operation scrap in the BOM, on the Items Detail Screen: General Data, under quantity data. You must also set the operations scrap net indicator at the same time.

Features

You should also set the net indicator, if operation scrap has not been maintained and assembly scrap has been entered. The assembly scrap should not, however, be taken into account.

Example

 

Quantity to be produced (required quantity)

1,000 pieces

 

Assembly scrap

10 %

Component 1

Operation scrap

No entry

 

Net indicator

Not set => assembly scrap is taken into account

 

=> Scrap quantity

100 pieces

Component 2

Operation scrap

1%

 

Net indicator

Set => assembly scrap is not taken into account

 

=> Scrap quantity

10 pieces

Before component 2 is built into the assembly, the incorrect assemblies are rejected and the system only takes the smaller operation scrap quantity into account. Therefore, component quantity of component 1 refers to 1,100 pieces to be produced; and the component quantity of component 2 refers to 1,010 pieces to be produced.